Anesti Excavation & Demolition is a Belmore based demolition and excavation contractor that pulls down houses and other structures across Sydney and prepares the site for the builder.
The standard method uses a 23 tonne hydraulic excavator, with asbestos and roof tiles removed by hand.
A demolition approval has to be in place before site works start. You can apply through your local council, or Anesti can appoint a private certifier. The business supplies the supporting documents: a waste management plan, Dial Before You Dig search results, its demolition licence, its workers compensation certificate of currency, and a safe work method statement written for your site. Allow two to five weeks for a demolition DA or complying development certificate.
Water, electricity, gas, sewer, NBN and telecommunications all have to be disconnected before demolition, and solar panels removed. Anesti guides the process and liaises with your builder. The accounts themselves are in your name, so gas meter abolishment, NBN disconnection and the Level 2 electrician who disconnects power from the street mains are arranged by the owner, with written confirmation and photos sent through before a start date is set.
No one works on site until the clearance certificate and tipping dockets have been issued.
Trees on the site are assessed, including whether they are unstable, diseased or dangerous. Stump removal, root removal and land clearing leave a level and tidy result, and chipping and mulching are available. Tree removal is subject to council approval and happens before demolition starts. Every tree removal is quoted individually.
Sediment control fencing is installed before demolition so soil and sand do not reach neighbouring properties, and most jobs need a sediment control plan lodged with the council. Temporary site fencing or hoarding of at least 1800mm, braced with clamps and concrete feet and locked, encloses the site for public safety. Temporary fencing is also available to hire on its own, with rates published on the website.
The physical demolition takes a few days, and can be anywhere from a single day to several days depending on the property. The longer part is the preparation. Approvals run two to five weeks for the demolition certificate, gas and NBN disconnections take about 21 days each, and electricity disconnection takes two to three weeks. Once every preliminary stage is verified, the job is scheduled to start within two weeks.
Yes. A development approval or complying development certificate is required before a building can be demolished. You can lodge it with your local council, or Anesti can arrange it through a private certifier. You also notify the council before demolition starts and arrange any pre-commencement inspection your approval conditions call for.
Every home or building is inspected for asbestos, lead paint and other hazardous materials before demolition. Anything found is removed first, by licensed specialists, under proper abatement procedures. Air monitoring is carried out and an independent licensed asbestos assessor issues the clearance certificate. Material is transported and disposed of to NSW EPA requirements and tipping dockets confirm lawful disposal. Mechanical demolition only begins once the clearance certificate is in hand.
The structure and its foundation are taken out down to the dirt and the debris is removed, and the same contractor can prepare the site for the rebuild. Small building waste left after the shaker bucket, such as broken brick, roof tile, concrete and paving, is tracked or back-bladed into the site surface rather than carted away.
Confirm in writing that the property is vacant and emptied of possessions and loose rubbish, and mark anything that is to stay, including trees, with barrier tape and a do not remove sign. Drain any pool that is coming out. Keep the lawn and council verge cut low. Supply the approved plans, service plans and Dial Before You Dig results, and obtain any council permits for standing plant, work zones or traffic management. The site entry needs at least 3.5 metres of width and 6 metres of height. Once demolition begins the site is handed over and the owner does not enter it.
The price varies by project. Anesti puts residential houses generally in the vicinity of $15,000 to $25,000, with the final figure driven by the size of the home, its location, the building type, and whether asbestos or tree removal is involved. Quotes are free, include an on-site inspection and are valid for 30 days.
Anesti Excavation & Demolition Pty Ltd is a family owned Sydney company, ABN 11 602 418 253, active on the Australian Business Register since October 2014 and registered for GST. It holds demolition licence AD 212085 and asbestos licence AD212086. The office is at Shop 1/466 Burwood Road, Belmore NSW 2192. Call 02 9011 6599 or email [email protected].